NETA test procedures — generated, reviewed, and tracked
| Script | Equipment | Method | Steps | Coverage | Status | Date |
|---|---|---|---|---|---|---|
| MV Switchgear Acceptance Test Medium-Voltage Switchgear | SWG-MV-01 | AI | 38 | 96% | In Progress | 2026-04-10 |
| Power Transformer Acceptance Test Power Transformer | XFMR-1A | AI | 42 | 100% | Completed | 2026-04-08 |
| LV Breaker Trip Testing LV Circuit Breaker | BKR-LV-03 | Template | 24 | 82% | Draft | 2026-04-12 |
| Protective Relay Test — 51/50 Protective Relay | RLY-SEL-751A | AI | 35 | 94% | In Review | 2026-04-11 |
| Battery System Baseline Battery System | BAT-DC-01 | Hybrid | 28 | 92% | Approved | 2026-04-09 |